E-131 Rehab. Update for Week of 11/13/2020
 
By Chief Engineer Chuck Doyle Jr.
November 13, 2020
 

Things really moved along this past week. New cabinet's have been installed in the rear jump seat area. As you can see in photos, the new LED lighting is real bright! All the seats have been reinstalled with the new walk-away SCBA brackets like in Engine 134. The new diamond plate looks to be just about done on the back of cab outside. The front bumper now has the siren speakers and new LED type driving light in place. Both right and left side hose troughs are just about done. New floor matting is in place per the one photo. More floors are still covered with cardboard until it's completed.