Updated Photo's on E-131 Refurb. for the Week of 11/6/2020
 
By Chief Engineer Chuck Doyle Jr.
November 6, 2020
 

Glass has been reinstalled in the cab. Looks as if the engine cover is back in place. Upholstery has been done and soon the seats should be reinstalled. A new plenum had to be ordered and installed for the rear A/C as it had a lot of cracked holes where the screws go due to age. President Dale Bollinger advised that the shop had to rebuild or replace the two cab cylinders as they would not lift the cab. Things are still moving along.