Atlantic Emergency Solutions' staff advised a lot of things are being installed and that much of the work behind the scenes is not that noticeable. But work is ongoing. Like camera wiring and cab items still being installed. The two cabinet's can be seen being wired for lights. Even part of Roto-Ray has been installed.